Our scope of our works is to lay or relay metal and plastic gas mains and services as part of our client’s asset replacement, diversion, condition and reinforcement programmes.
Framework for Distribution Overhead Line Works up to 33kV
Utilergy are currently completing a framework to provide the construction, maintenance and dismantlement of overhead lines and wood poles on networks up to 33kV for Scottish and Southern Electricity Networks (part of the SSE group).
Provision of Gas Purge and Re-light Services framework
Utilergy provides fully qualified resource for the provision of Gas Purge & Relight Services and associated works across Cumbria and the North East of England.
Rapid Response Operatives (RRO) Emergency Services framework
Utilergy provides Rapid Response Operatives (RRO) to 24/7/365 Gas Emergency Services associated with the Customer Operations Emergency Locate and Repair Programme.
Underground Construction Framework
Utilergy is currently completing a framework contract for Electricity North West to provide underground cabling and associated services.
Design and Refurbishment of LV and HV overhead line network, with known ESQCR defects
Utilergy has completed an extensive work programme to remove known defects from the overhead line system in East Anglia.
Provision of Design and Construction services for known defects on the HV & LV systems
Utilergy are well known for our expertise and experience in designing solutions and removing defects from the overhead line network to comply with ESQCR, and we were happy to support Enterprise in clearing the network from defects in the East Midlands region.
ESQCR Low Ground Clearance Solutions Provision
Our client had 8500 known low ground clearance defects on their overhead line system, which required survey and the design of solutions to overcome each defect, in order to comply with the Electricity Safety, Quality and Continuity Regulations (ESQCR).
ESQCR – LV and HV Asset Refurbishment
Utilergy completed a two year contract to support Enterprise in the completion of asset refurbishment works for Scottish Power Energy Networks. We completed a wide range of activities on the electricity distribution system including high and low voltage overhead line refurbishment, substation rebuilds, service renewals, low voltage rebuilds, and large scale restringing of low voltage and high voltage conductors.