0191 375 5700 enquiries@utilergy.co.uk

Framework for Distribution Overhead Line Works up to 33kV

Client: Scottish and Southern Electricity Networks
Region: South of England

Utilergy are currently completing a framework to provide the construction, maintenance and dismantlement of overhead lines and wood poles on networks up to 33kV for Scottish and Southern Electricity Networks (part of the SSE group). Our team of qualified overhead linesmen are completing the works within SSEN’s south distribution network in the South of England as well as emergency storm cover in the South of England and Scottish regions.

More case studies

Underground Construction Framework

Utilergy is currently completing a framework contract for Electricity North West to provide underground cabling and associated services.

ESQCR Low Ground Clearance Solutions Provision

Our client had 8500 known low ground clearance defects on their overhead line system, which required survey and the design of solutions to overcome each defect, in order to comply with the Electricity Safety, Quality and Continuity Regulations (ESQCR).

ESQCR – LV and HV Asset Refurbishment

Utilergy completed a two year contract to support Enterprise in the completion of asset refurbishment works for Scottish Power Energy Networks. We completed a wide range of activities on the electricity distribution system including high and low voltage overhead line refurbishment, substation rebuilds, service renewals, low voltage rebuilds, and large scale restringing of low voltage and high voltage conductors.