Location: Norwich, East Anglia
Utilergy has completed a work programme to remove known defects from the overhead line system in East Anglia. Our construction works has included extensive wood pole changes, ABC conductoring and service renewal on the low voltage network.
In addition, we have designed solutions for each defect identified on the system, with responsibility for the completion of a comprehensive network appraisal. The aim being to make the entire section of the network covered by each system outage compliant with specification and the Electricity Safety,Quality and Continuity Regulations (ESQCR).
We have completed our works in a geographic format, focusing our entire team in one area to clear all defects before moving on to the next area. This approach is more efficient for all parties and minimises the overall disruption to customers.