by Utilergy | Oct 28, 2013 | Case Studies
Client: Scottish Power Energy Networks (SPEN) Location: Cheshire and North Wales Our client had 8500 known low ground clearance defects on their overhead line system, which required survey and the design of solutions to overcome each defect, in order to comply with...