by Utilergy | Oct 28, 2013 | Case Studies
Location: Norwich, East Anglia Utilergy has completed a work programme to remove known defects from the overhead line system in East Anglia. Our construction works has included extensive wood pole changes, ABC conductoring and service renewal on the low voltage...
by Utilergy | Oct 28, 2013 | Case Studies
Client: Enterprise plc., for E.ON Central Networks Location: East Midlands Utilergy are well known for our expertise and experience in designing solutions and removing defects from the overhead line network to comply with ESQCR, and we were happy to support Enterprise...
by Utilergy | Oct 28, 2013 | Case Studies
Client: Scottish Power Energy Networks (SPEN) Location: Cheshire and North Wales Our client had 8500 known low ground clearance defects on their overhead line system, which required survey and the design of solutions to overcome each defect, in order to comply with...
by Utilergy | Oct 28, 2013 | Case Studies
Client: Enterprise plc, for Scottish Power Energy Networks (SPEN) Location: Cheshire and North Wales Utilergy completed a two year contract to support Enterprise in the completion of asset refurbishment works for Scottish Power Energy Networks. We completed a wide...
by Utilergy | Oct 27, 2013 | News
Welcome to Utilergy Limited